Honomu House Construction IV

- Steel arrives, house construction starts

Trouble viewing images? See these tips.

November 17 - Kitchen wall panels, second floor base completion

 

November 11 - Wrapping up second floor beam & railing installation


November 10 - Work starts on second floor beams, Mauna Kea view

 

November 5 - First floor T&G decking installation, views from 1st floor

 

October 22 - First floor steel in place after 2nd shipment arrives


September 3 - First shipment arrives - some beams, roof and siding



Photos of earlier construction work are available here.

Tips for viewing pictures:

If all icon images do not display, hit the refresh button on your browser or click to view the large image.

Click on pictures for a larger (XGA), higher resolution image. The image will open in new window. Resize it for maximum picture size. When you click on other small pictures, they will open in this new window. You can use the ALT-TAB key combination to switch between windows if you are using a Windows based operating system. If you have having trouble viewing the pictures, consider upgrading to a new browser such Mozilla or FireFox. Both are available for Linux, Mac and Windows systems at www.mozilla.org.  To save picture to your hard disk, right click on small image and select "save link as" and select the location where you want to store. Alternatively, if you are looking at the large image in its own window you can select "File Save Page As" from the main menu or right click on the image and select "Save Image As". My favorite image viewer is Irfanview.